170 nodes across three production halls, live and self-reporting.

How we replaced a leading automotive manufacturer's manual energy + water audits with a continuous-monitoring mesh that pays back in months — not years.

At a glance
ClientLeading automotive manufacturer
SiteCentral India — Plant 04
Scope3 halls
SolutionsMT-SEM-01, MT-SWM-02, MT-I40-04
StatusOperational · Phase 2 planned
170
Nodes deployed
3
Production halls
24/7
Continuous monitoring
1
Single dashboard
§01 — Challenge

The clipboard era.

The client's Plant 04 ran a monthly energy audit. Two engineers, three days, 100+ panels — and the data was already stale by the time it landed in a spreadsheet. Water tracking was worse: a quarterly read of bulk meters with no breakdown by hall.

The plant manager wanted three things: live numbers, leak alerts before the floor noticed, and a single screen for the morning standup. The existing SCADA touched only the boilers.

§02 — Architecture

What we built.

HALL A62 nodesHALL B58 nodesHALL C50 nodesGATEWAYS×2 LoRaWANMQTT · TLSPLATFORMSensoverse CloudSAP ERPDASHBOARDSMS / EMAIL
§03 — Timeline

Four phases, end to end.

Phase 01

Site survey + Hall A pilot

32 nodes
Phase 02

Full Hall A + Hall B rollout

+88 nodes
Phase 03

Hall C + water network

+50 nodes
Phase 04

ERP integration + handover

170 live
§04 — Outcome
"We saw the first leak alert at 3:14am — 90 minutes before the morning shift would have spotted the puddle. That single catch paid for the deployment."
PE
Plant Engineering Lead
Leading automotive manufacturer