India · UAE · 12 years of IoT engineering
info@mutechautomation.com·EN
Solutions/IoT/Smart Energy Metering
MT-SEM-01 · Smart Energy Metering

Sub-meter every feeder.
Beat the demand charge.

LIVE·1,240 meters · 9.2% kWh saved · ₹1.8 Cr / yr MD avoided

Class 0.5S three-phase meters. Sub-second sampling, 15-min uplink, demand prediction on the edge — alerts the floor 8 minutes before you'd cross the contract MD ceiling. Tenant-grouped totals roll straight into invoice-ready CSV. The meter the utility itself doesn't dispute.

What we measure
kWh · kVArh · kVAhPer-phase V · I · PF15-min demandToU tariff windowTHD V & I · IEEE 519Harmonics 2–50Sags / swellsFour-quadrant
Sensoverse · Energy — operations console
Sensoverse/Energy/Automotive plant · Plant 04LIVE · 14:32 IST
LOAD CURVE · LAST 24 H·PLANT INCOMER A+BkWMD ceilingPeak tariff
CONTRACT MD · 1000 kWNOW · 924 kW
00:0004:0008:0012:0016:0020:0024:00
Live · plant kW
916kW
Today · MD reached
962kW
Plant PF
0.94
Energy · today
14,820kWh
// Plant incomer + every outgoing feeder. One screen. MD ceiling visible.
0.5S
Accuracy class
9.2%
Avg kWh saved
₹1.8 Cr
MD avoided · / yr
15 s
Uplink interval
§01 — What this is

Most plants get an energy bill once a month. Yours should see the meter every 15 seconds.

01

Class 0.5S · NPL-traceable

Utility-grade accuracy, sealed revenue-grade variant, calibration traceable to NPL. Bills the utility itself can't dispute, and a base the energy manager can defend in audit. Not 'smart-meter grade'.

02

Demand intelligence on the edge

15-min rolling demand vs the contracted MD ceiling, computed on the meter. SMS / SCADA / SAP alert 8 minutes before a breach — long enough to shed a non-critical load and dodge the surcharge.

03

Sub-billing · not just monitoring

Tenant-grouped totals roll into invoice-ready CSV every cycle. ERP / SAP / Tally webhooks. Landlord-recovery billing automated; the monthly reconciliation argument disappears.

§01 — Complete stack

End-to-end. Not just a device.

A solution is hardware in the field plus the infrastructure that makes the data useful — secure ingestion, a dashboard your team actually opens, and APIs to whatever runs your business.

L4
Apps & Dashboard
Role
Visualisation, role-based views, reports, alerts, ticketing
Tech
Sensoverse Web · Mobile · Open API · Webhooks
L3
Application Server
Role
Business logic, rules engine, analytics, ML, multi-tenant data isolation
Tech
Sensoverse Cloud · on-prem · hybrid · TimescaleDB · Postgres · ClickHouse
L2
IoT / Network Server
Role
Device management, message routing, decoding, OTA, downlinks
Tech
ChirpStack · MQTT broker · LwM2M · OPC-UA gateway
L1
Field — Smart Energy Meter (MT-SEM-01)
Role
Sensors, actuators, edge compute, gateways
Tech
LoRaWAN · WiFi · Modbus

// Deployments can run on Sensoverse Cloud, on your VPC, fully on-prem, or hybrid. Data residency: India (Mumbai) and UAE (Dubai) regions available.

§03 — Where it goes

Eight metering applications. One stack.

Pick a row — see what the meter does there.

01 / 08 · Plant incomer

HT / LT main · demand tracking

Class 0.5S meter on the utility tie. Tracks 15-min rolling demand against the contracted MD ceiling and triggers an SMS / SCADA alert 8 minutes before you'd cross it. Saves the demand surcharge before the bill arrives.

15-min rolling MD vs ceiling
Predictive 8-min lookahead alert
ToU tariff window state
Sealed revenue-grade option
§04 — Why not the others

Static utility meters know the bill. Yours should know the cause.

A revenue meter on the incomer tells you how much you owe. It can't tell you which feeder, which shift, which harmonic, which capacitor bank or which welder is responsible. Ours can — and ours can act on it in time to stop the demand charge.

The old way

Revenue meter + clipboard

CoverageIncomer only
SamplingOnce / month
Demand alertAfter the bill
Sub-billingManual round, paper
Power qualityPeriodic audit
IntegrationPDF in an inbox
MuTech · sub-metered

Per-feeder, every 15 s

CoverageEvery feeder · every load
Sampling5 kHz · uplink 15 s
Demand alert8 min before breach
Sub-billingAuto CSV · ERP hook
Power qualityContinuous · IEEE 519
IntegrationREST · OPC-UA · MQTT
§03 — Dashboard & analytics

What your team sees.

Live KPIs, drill-downs, scheduled reports, and role-based access — out of the box. Custom widgets and white-label themes available.

Live load
412 kW
Aggregate across feeders
PF
0.94
Power factor, last 15 min
kWh today
8,210
vs 8,540 baseline
Demand peak
496 kW
14:32 IST
Insights produced
  • 01Per-circuit consumption with shift / production overlay
  • 02Power factor and harmonic distortion trend with violation flags
  • 03Peak demand forecasting — alerts before contracted limit hit
  • 04Sankey of energy flow: incomer → MCC → equipment cluster
  • 05Cost allocation reports per cost-centre, exportable to SAP
Alerts & events
  • Demand > 90% of contract
  • PF < 0.90
  • Phase imbalance > 5%
  • Comms outage > 5 min
// Channels: SMS · Email · WhatsApp · webhook · ITSM
§04 — Security & infrastructure

Built for plant & campus IT.

Industrial sites have non-negotiables — segmentation, audit trails, and the ability to run when the WAN drops. We design for that on day one.

Transport
TLS 1.3 device → cloud. Mutual auth via X.509 or pre-shared keys. LoRaWAN 1.0.4 / NB-IoT carrier-grade encryption end-to-end.
Identity
Per-device certificates, automated rotation. RBAC + SSO (SAML / OIDC). Audit log of every operator action.
Data
AES-256 at rest. Tenant isolation at row + schema level. Configurable retention, GDPR / DPDP-aware exports and deletes.
OTA &amp; ops
Signed firmware, staged rollouts, rollback. 24×7 monitoring, on-call, runbooks. SLA up to 99.95%.
Deploy
Sensoverse Cloud (default), private VPC, on-prem (air-gapped), or hybrid. Mumbai & Dubai regions.
Compliance
ISO 27001 controls, SOC 2 Type II in progress. Vendor / penetration test reports under NDA.
§05 — Use cases

How customers use it.

Real applications, real outcomes. Every site is engineered — these are reference deployments to anchor a conversation.

ManufacturingUSE-01
Scenario
Automotive plant — 170 meters across press shop, paint shop, assembly
Outcome
9.2% energy reduction in Y1; demand-charge avoidance ₹1.8 Cr / year
Commercial Real EstateUSE-02
Scenario
Commercial tower (Dubai) — tenant-level sub-metering, 24 floors
Outcome
Automated landlord recovery billing; 4% reduction in HVAC base load
EducationUSE-03
Scenario
University campus (UAE) — 6-building campus, hostels + labs + classrooms
Outcome
Visibility into off-hours load; lab equipment scheduling reform
§07 — Devices used

The full sub-metering stack.

Meters, CTs, gateways, edge concentrator, optional PQ logger and the Sensoverse Energy platform. Sized to your site after a one-call scoping.

Model
Role
Key specs / note
MT-SEM-01-3P
Three-phase smart meter
Class 0.5S · 5 kHz · 256 pts/cycleLoRaWAN + RS-485 (Modbus RTU)DIN-rail · 24 V DC or battery

Workhorse SKU. 30+ parameters per phase per cycle. Sealed revenue-grade variant for tenant-recovery billing.

MT-SEM-01-1P
Single-phase meter
Class 1.0 · single phase + neutralLoRaWANCompact · 1M DIN

For lighting circuits, small tenant boards, EV AC ports — anywhere a single-phase MCB needs sub-metering.

MT-CT-200/5
Split-core CTs
Primary 50 A – 4000 A0.5% accuracy classTool-less install · no shutdown

Clamp on live conductors. Sized to feeder per scoping call. Same form factor across SKUs for inventory.

MT-RG-3P
Rogowski coil set
Primary 100 A – 10 000 AFlexible · 200 mm – 1000 mm loop0.5% accuracy

For HT incomers, bus-bars and awkward retrofits where split-core CTs won't fit. Pairs with MT-SEM-01-3P.

MT-GW-LR8
LoRaWAN gateway
8-channel · IN865 / EU868 / AS923PoE 802.3at + 4G fallbackChirpStack onboard, OTA fleet

Covers ~6 km line-of-sight, ~1 km in a dense plant. One per plant for most sites; two for HT yards.

MT-EDGE-X1
Edge concentrator
Modbus → MQTT bridgeLocal 30-day bufferOPC-UA / REST egress

For RS-485 fleets and air-gapped sites. Buffers locally; pushes when the LAN reappears.

MT-PQ-AUDIT
Power-quality logger
Class A IEC 61000-4-30Sags / swells / transientsIEEE 519 report engine

Drop-in PQ audit for 7-day disturbance studies. Optional add-on; not required for standard sub-metering.

Sensoverse — Energy
Operator + tenant dashboards
Demand · ToU · sub-billingERP / Tally / SAP webhookMobile + web

Operator console for FM / energy manager. Tenant view for occupants. Public ESG widgets optional.

§08 — Specifications

Engineering data.

// Indicative — full datasheet on request.

Accuracy class0.5S kWh · 1.0 kVArh · IEC 62053-22
Voltage range3 × 57.7 / 100 V to 3 × 240 / 415 V
Current range0.05 A – 100 A via CT · 10 000 A via Rogowski
Sampling rate5 kHz · 256 points / cycle
Parameters30+ per phase per cycle — V · I · PF · THD · kWh · kVArh · kVAh
Frequency45 – 65 Hz · all parameters
Uplink interval15 s – 60 min · configurable
ConnectivityLoRaWAN · RS-485 · NB-IoT · LTE-M · WiFi
Power24 V DC · 230 V AC · 8-yr battery (low-rate)
MountDIN-rail · panel cut-out · sealed revenue-grade variant
EnclosureIP65 front · IP54 rear · PC/ABS UL94 V-0
Operating temp−20 °C → +60 °C · −40 °C storage
Surge6 kV / 1.2/50 µs · EN 55022 Class B
CertificationsCE · CBIP · CMRI · BIS · NPL-traceable
§09 — Deployments

Where it's running, right now.

Manufacturing1,240 meters
since 2024

Automotive manufacturer · Central India

Automotive plant · press / paint / assembly
1,240
meters online

9.2% kWh reduction in Y1. ₹1.8 Cr / year demand-surcharge avoided by predictive MD alerts. Per-shop cost lines now part of the daily ops review.

Real EstateTenant billing
since 2025

Commercial tower · Dubai

Commercial · 24 floors · tenant sub-billing
180
meters online

Automated landlord-recovery billing across 24 floors. 4% HVAC base-load reduction discovered in off-hours data. Recovered ~AED 220k in mis-billed common-area energy in Y1.

EducationMulti-building
since 2023

University campus · UAE

Campus · 6 buildings · hostels + labs + classrooms
94
meters online

Off-hours load made visible — lab equipment scheduling reformed. Discovered three rogue VFDs running unloaded overnight; saved 142 MWh/yr after fix.

§10 — Pilot

10-meter pilot in 30 days.

Send a single-line diagram and we'll come back with a feeder list, a sized BOM and a fixed-price quote in 24 hours. Field engineer on-site for commissioning. Decision in 60 days.

Commercial — how we sell it
MOQ10 meters / pilot
Lead time4–6 weeks
Warranty2 years on hardware
Made inIndore, India
EngineeringOn-site commissioning
Pilot10 feeders · 30 days